The communications log
Logging calls, site visits and decisions on a project, and reading the studio-wide feed.
Interior design runs on conversations that happen away from the keyboard: a call about brass finishes, a site visit where the GC mentions a ceiling height, a text confirming a delivery window. The communications log is where those land, so the project remembers them after you've forgotten.
Where entries are written
Entries are written on a project, under its Communication tab. Log what was said, who said it, and what it changes — one entry per conversation.
The studio-wide Communications page in the left nav is the read view: everything logged on every job, newest first, grouped by day.

What a good entry looks like
The demo studio's entries are the right shape:
Call with Catherine — she prefers unlacquered brass for the primary bath; requesting a Perrin & Rowe quote through the rep.
Site visit — framing complete in the great room; picture-light rough-ins marked on the north wall.
Each one carries a decision or a fact someone will need later. Compare with "talked to client", which records that time passed.
Write entries as though the person reading them is a teammate covering for you next week — because eventually that's who reads them.
Comments and mentions
Entries can be discussed in place: a teammate comments on an entry, and mentioning someone notifies them. That keeps the follow-up attached to the conversation it belongs to, rather than starting a parallel thread in email.
Contributors can edit their own entries — for the typo, the misheard number, the detail you remembered on the drive back.
What it isn't
The log is internal. It's not the client's message thread — that's the portal's Messages tab, which the client can see and reply to. Keep internal assessments ("budget is going to be a problem") in the log; keep things you'd say to the client's face in Messages.
Why bother
Three payoffs, all of them arriving later than the effort:
- Continuity. A project that spans nine months outlives anyone's memory of the phone call in month two.
- Cover. "We agreed unlacquered brass on July 30" is a better position than "I'm fairly sure we discussed it."
- Handover. A teammate joining mid-project can read the log and be current in ten minutes.
Related
Related in Projects
- 01Projects→Sending a contractHow to draft, send, and collect an e-signature on a contract — from inside Studiohaus, no DocuSign needed.4 min read· Updated May 1, 2026
- 02Projects→Creating a projectHow a project is structured in Studiohaus, what to fill in when you create one, and what comes next.6 min read· Updated May 1, 2026